Monday, 20 February 2012

Week 18-draft deliverables hand in

I have now handed in my draft deliverables and look forward to recieving feedback.

I have started building my system but as thought it is slow progress! This week I aim to create all my pages and then I can concentrate on the difficult parts next week.
EmmA

Sunday, 5 February 2012

Week 16- 05/02/2011

I have now completed my database model and project plan that Dave advised me to complete before the next meeting. I would like some feedback on the model as I am not sure it is all correct.

I have built a bit more of my system and my aim is to finish the basic build (without intelligence) by the end of week 18.

I am happy with my project report so far but need to add more UML diagrams
Emma

Thursday, 2 February 2012

Feedback

During the presentation I received the following feedback:

  • Research Database management systems- Something similar to Drupal but for questionnaires.
  • Business re-processing- Looking at the EUI's system as a whole
  • How I could expand on the project- the Won't section of Moscow
  • Look at testing options
All other feedback was aspects I'd already completed and just not mentioned on my posters.

Emma

Monday, 23 January 2012

Week 14

This week I have started to build my system. I have also wrote a to do list to try and finish my report (of what I can do before the system is actually built). I aim to finish these by week end 17, but to build the system at the same time.
I have found useful resources such as help videos to assist with the build and I am starting to feel more comfortable with PHP.

Emma

Tuesday, 17 January 2012

Consolidation week

After recieiving some useful feedback from my posters, I will discuss aspects of the feedback  with Dave in my next meeting.

Now I have completed most of my report (obvioulsy except from testing and evaluations) I will start to build my system.

The first simple step is to install MySQL and PhP onto my computer.

Generally, I just need to bulk up sections of my report and add infomation about other similar systems.

Emma

Wednesday, 7 December 2011

Feedback- Terms of Reference

After my meeting with Dave regarding my ToR, there are a few changes I need to make and a few points to keep in mind when I come to write the full report.

It may be useful to look at the Hybrid approach as I could use prototyping when composing the emails to send to applicants. This is part of the Agile methodology a it won't be completed before production. Also, I shouldn't use Gabrielles name but call her by her job title 'Software Manager'. Throughout the report I refer to the system as a form but it would be more clear if I called it an application process or system.

It is important to clarify ideas more instead of using vague language. Also, I need to reference facts and ideas from others unless the information is my own opinion.

Regarding  the technical side, I should separate the asp.net sides and not mix the language with frameworks such as MVC. It needs to be clear that the server side scripting languages I am comparing is ASP and PHP. I need to add more information about SQL Server and research ODBC.

Points to consider when writing the full report are:

  • Widows and Orphans combinations
  • Cross reference diagrams and captions
  • User Chapters
  • Referencing
  • Evaluation- use 1st person
  • Page numbers

Week 11- 05/12/2011

I am still waiting for most of the questionnaires and therefore have left that aspect and I am not comparing existing systems.

I have researched how to send an email withing PHP and it isn't as complicated as I thought.
I am just about back on track with my work after my abscence and I am looking forward to doing alot more work on my project over the Christmas holidays.

Emma

Aims for Christmas holiday:
  • Analyse questionnaires
  • Complete research on existing systems
  • Prepare for consildation week
  • Read up and practice with MySQL and PHP
  • Decide upon development method
  • Start to put together overall report